Ground Breaking Ceremony

Read Beacon Article
Read Sun Times Article
See the Development

Watch the Construction

 

 

 


 

 

 

Saugeen Shores Skate Park Committee Logo
 

$355,000.00
 
$305,000.00
 
 
 
 
 
 
$0

Fundraising
Campaign

Why did the cost go Down?

We reduced the size by 2000 sqft to satisfy town requirements and a special thanks to Akert Construction for the site preparation.

ENTER SITE